Enhanced evaluation method of sigma level in six-sigma activities

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

5 Citations (Scopus)

Abstract

This paper deals with alternative measurement method for determine the sigma level in Six sigma activities. Determining the sigma level in the DFSS based Six sigma project is the key factor of the whole project performance because the sigma level is the single number that indicates the level of project success based on CTQ that determined in the Six sigma projects. Tractable results are obtained by using statistical congruent method and concept of Takuchi method. The Six-sigma project has been completed is demonstrated as a case study. Alternative method are applied to find sigma level more efficiently.

Original languageEnglish
Title of host publicationProceedings of the 4th IEEE International Conference on Management of Innovation and Technology, ICMIT
Pages1116-1119
Number of pages4
DOIs
Publication statusPublished - 2008
Externally publishedYes
Event4th IEEE International Conference on Management of Innovation and Technology, ICMIT - Bangkok, Thailand
Duration: 21 Sept 200824 Sept 2008

Publication series

NameProceedings of the 4th IEEE International Conference on Management of Innovation and Technology, ICMIT

Conference

Conference4th IEEE International Conference on Management of Innovation and Technology, ICMIT
Country/TerritoryThailand
CityBangkok
Period21/09/0824/09/08

Fingerprint

Dive into the research topics of 'Enhanced evaluation method of sigma level in six-sigma activities'. Together they form a unique fingerprint.

Cite this