Abstract
Currently, some fault prognosis technology occasionally has relatively unsatisfied performance especially for incipient faults in nonlinear processes duo to their large time delay and complex internal connection. To overcome this deficiency, multivariate time delay analysis is incorporated into the high sensitive local kernel principal component analysis. In this approach, mutual information estimation and Bayesian information criterion (BIC) are separately used to acquire the correlation degree and time delay of the process variables. Moreover, in order to achieve prediction, time series prediction by back propagation (BP) network is applied whose input is multivariate correlated time series other than the original time series. Then the multivariate time delayed series and future values obtained by time series prediction are combined to construct the input of local kernel principal component analysis (LKPCA) model for incipient fault prognosis. The new method has been exemplified in a simple nonlinear process and the complicated Tennessee Eastman (TE) benchmark process. The results indicate that the new method has superiority in the fault prognosis sensitivity over other traditional fault prognosis methods.
| Original language | English |
|---|---|
| Pages (from-to) | 1413-1422 |
| Number of pages | 10 |
| Journal | Chinese Journal of Chemical Engineering |
| Volume | 24 |
| Issue number | 10 |
| DOIs | |
| Publication status | Published - 1 Oct 2016 |
| Externally published | Yes |
Keywords
- Fault prognosis
- Local kernel principal component analysis
- Time delay estimation
Fingerprint
Dive into the research topics of 'Multivariate time delay analysis based local KPCA fault prognosis approach for nonlinear processes'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver