Delay analysis of IEEE 802.15.6 use of emergency medical services on human body communication

Ze Tian Wang, C. T. Lam, M. Wang, Z. M. Wu, F. Wan

研究成果: Conference contribution同行評審

1 引文 斯高帕斯(Scopus)

摘要

Networking with various healthcare devices on human body is one of the targeted applications of the IEEE 802.15.6 standard. Among those, human body communication is considered to have better performance in terms of power consumption and security for implanted and swallowable devices. Different from general applications of BAN, healthcare device network with implanted/swallowable devices requires a better understanding of the necessary time delay for the emergency messages transmission. In this article, we analyzed the delay of emergency message transmission based on IEEE802.15.6 at HBC. Both theoretical analysis and simulation were employed to calculate the average and shortest transmission delay, and also the distribution of the transmission delay at multi-user multi- UPs for slotted Aloha access protocol.

原文English
主出版物標題6th European Conference of the International Federation for Medical and Biological Engineering - MBEC 2014
編輯Igor Lackovic, Darko Vasic
發行者Springer Verlag
頁面723-727
頁數5
ISBN(電子)9783319111278
DOIs
出版狀態Published - 2015
事件6th European Conference of the International Federation for Medical and Biological Engineering, MBEC 2014 - Dubrovnik, Croatia
持續時間: 7 9月 201411 9月 2014

出版系列

名字IFMBE Proceedings
45
ISSN(列印)1680-0737

Conference

Conference6th European Conference of the International Federation for Medical and Biological Engineering, MBEC 2014
國家/地區Croatia
城市Dubrovnik
期間7/09/1411/09/14

指紋

深入研究「Delay analysis of IEEE 802.15.6 use of emergency medical services on human body communication」主題。共同形成了獨特的指紋。

引用此