跳至主導覽 跳至搜尋 跳過主要內容

Delay analysis of IEEE 802.15.6 use of emergency medical services on human body communication

  • Ze Tian Wang
  • , C. T. Lam
  • , M. Wang
  • , Z. M. Wu
  • , F. Wan
  • University of Macau
  • Fuzhou University

研究成果: Conference contribution › 同儕審查

1 引文 斯高帕斯(Scopus)

摘要

Networking with various healthcare devices on human body is one of the targeted applications of the IEEE 802.15.6 standard. Among those, human body communication is considered to have better performance in terms of power consumption and security for implanted and swallowable devices. Different from general applications of BAN, healthcare device network with implanted/swallowable devices requires a better understanding of the necessary time delay for the emergency messages transmission. In this article, we analyzed the delay of emergency message transmission based on IEEE802.15.6 at HBC. Both theoretical analysis and simulation were employed to calculate the average and shortest transmission delay, and also the distribution of the transmission delay at multi-user multi- UPs for slotted Aloha access protocol.

原文English
主出版品物標題6th European Conference of the International Federation for Medical and Biological Engineering - MBEC 2014
編輯Igor Lackovic, Darko Vasic
發行者Springer Verlag
頁面723-727
頁數5
ISBN(電子)9783319111278
DOIs
出版品狀態Published - 2015
事件6th European Conference of the International Federation for Medical and Biological Engineering, MBEC 2014 - Dubrovnik, Croatia
持續時間: 7 9月 2014 → 11 9月 2014

出版品系列

名字IFMBE Proceedings
卷45
ISSN(列印)1680-0737

Conference

Conference6th European Conference of the International Federation for Medical and Biological Engineering, MBEC 2014
國家/地區Croatia
城市Dubrovnik
期間7/09/14 → 11/09/14

UN SDG

此研究成果有助於以下永續發展目標

  1. Good health and well being
    Good health and well being

指紋

深入研究「Delay analysis of IEEE 802.15.6 use of emergency medical services on human body communication」主題。共同形成了獨特的指紋。

引用此